3.138.141.202
3.138.141.202
close menu
KCI 후보
소수리와 완전수리를 동반한 최적계획 교체 모델
The Optimal Planned Replacement Model With Minimal And Perfect Repair
이진식 ( Jin Shik Yi ) , 박태근 ( Tae Keun Park )
UCI I410-ECN-0102-2009-550-003243644

In this paper we investigated a replacement model with two types of repairs. Repairs are classified into minimal and perfect repair. An operating unit is completely replaced whenever it reaches age τ(τ> 0) at a cost c,(planned replacement). If it fails at age t <τ, it is either restored by a entire unit with probability d(t) at a cost c2(perfect repair), or it undergoes minimal repair with probability p(t) = 1 - p(t) at a cost c₃. After a planned replacement, the procedure is repeated. The aim of this paper is to find conditions where the optimal planned replacement period τ^(*) which minimizes the total long-run expected cost per unit time can exist.

[자료제공 : 네이버학술정보]
×